IPC Commissioning Planning Engineer - Nuclear
Skilled Worker visa sponsorSponsored 36 workers in 2025 (Home Office data)The advertAbout the job
As posted by WoodWood Commissioning is recruiting for an experienced IPC Commissioning Planning Engineer to support EDF at Hinkley Point C (HPC). Ideally based locally to the area, successful candidates will be engaged on a 12 month rolling PAYE contract working 40 hrs/week Monday to Friday at the HPC Site in Bridgwater.
The Role
Working in the Central Controls Teams as part of the Planning Discipline of Project Controls, under the direction and leadership of the IPC Planning Manager, to be responsible for the management of the Level 2/4 (client) Integrated Work Schedule (IWS) in adherence with HPC processes. This will include managing the alignment of Level 3 (contract) schedules, and provision of time-related data and analysis. To support the IPC Planning Manager in leading central Planning activities for the Project and in developing Planning standards, policies and strategies. To support EDF Energy in making informed decisions to support the efficient and timely delivery of work scope.
It is the overarching objective of the Integrated Project Controls (IPC) Function to act as a centre of excellence. the intelligent owners of the single source of delivery performance information, operating as an integrated enabler for the successful delivery of the HPC Project.
Operating Environment
- In order to understand the operating environment, the job-holder will be familiar with the following key documents:
- Company Manual – outlines the purpose of the company
- Project Execution & Business Plan – describes the delivery strategy for the Project
- Project Delivery Model – signposts readers to key procedures
- Integrated Project Controls Manual – how work is undertaken in the Integrated Project Controls Function
- Discipline-specific Procedures – detailed activity steps, interfaces, etc.
- The Nuclear environment is highly regulated by the Office for Nuclear Regulation (ONR)
- Nuclear Safety Culture is of paramount importance to the Project and embedded throughout
Challenges and Problem Solving
- Ensure alignment of data between Planning and other Disciplines of Integrated Project Controls
- Manage schedule changes within the Programmes
- Work with key interfaces to identify and understand issues and concerns
- Collaboratively resolve issues, implement corrective action or escalate as required
Decision-Making
- The jobholder will be responsible for Project data within their area of work and will have authority to make decisions relating to the maintenance of the data. The jobholder’s line manager will be accountable for the data and material decisions will be referred upwards accordingly
Our Clients and Projects
Designing the future. Transforming the world.
Hinkley Point C (HPC) is a first‑of‑a‑kind UK EPR nuclear construction project and one of the most complex engineering undertakings in Europe. The Commissioning Programme leads the transition from construction to operation, demonstrating to regulators that systems are safe, compliant and ready for service.
Key responsibilities will include:
Team
- Support the IPC Lead Planner in the implementation and maintenance of Project Controls processes for Planning
- Support Senior Project/ Programme Managers including the production of monthly reports, through the provision of intelligent information and analysis
- Collaborate with other Disciplines of Integrated Project Controls, as well as other Project Support Functions, to help deliver Project goals in keeping with the HPC principles of Trust, Transparency and Teamwork
Core Processes
- Produce and maintain the schedule baseline IWS in Primavera 6 (P6), with fully logic-linked work plans aligned to the Work Breakdown Structures (WBS) and utilising approved construction techniques
- Ensure the Level 2/4 IWS is updated to an agreed timeframe
- Assist in the Trend & Change process, including analysis at Project level, generating performance indicators and providing feedback on areas of risk and opportunities
- Identify, analyse and provide solutions to time-related issues
- Co-ordinate, verify and produce Project-level schedule reports to a defined reporting cycle, including commentary on key time-related drivers and performance issues
- Adhere to Project governance and Scheduling standards and procedures
- Ensure all Project documents, in particular Sensitive Nuclear Information, are correctly protectively marked, and protected in accordance with EDF policies and procedures
Functional Management
- Accountable for the adherence of direct reports to Project governance and standards
- Proactively seek to continuously improve Discipline performance by implementing best practice and learning
- Facilitate collaboration with Programme teams and wider industry partners to ensure consistency and transparency in approach and data
- Take necessary care to ensure that direct reports properly protect the confidentiality, integrity and availability of corporate information from unauthorised disclosure, modification or destruction
- Support the recruitment process for the Discipline
- Act as a role model for HPC Project and EDF Energy by exhibiting and encouraging behaviours which are in alignment with the Project's values of Humility, Positivity, Clarity, Respect and Solidarity
Dimensions
- Hinkley Point C is a circa £26bn project
- This role will involve working within the Central Controls Team, which is the sub-division of Integrated Project Controls Function that operates at Project level
- The scope of each individual role will vary depending on the job-holder’s area of responsibility
- The role reports to the IPC Planning Manager
What makes you remarkable?
Expected
- Minimum of a degree in Engineering, Construction or other related field, or HND or equivalent qualification with recognised experience commensurate with a degree
- Professionally qualified with chartered or equivalent status
- Proven relevant experience in a Project Management or Project Controls environment in a similar Scheduling role on a major construction project
- Substantial experience in the use of scheduling software, ideally Primavera P6 version 7 and above
- Experience of commercial contracting
- Detailed understanding of scheduling methodologies and techniques
- Technical and practical comprehension of engineering, procurement and construction methods and techniques in a UK context
- Ability to produce accurate, complete and fully logic-linked construction plans
- Understanding of other Disciplines of Project Controls (particularly Estimating, Cost and Risk) including management techniques and associated software
- Understanding of earned value analysis
- Understanding of various contract types, in particular the NEC suite and FIDIC
- Working knowledge of schedule risk analysis techniques
- Good commercial awareness
- High level of analytical and numerical skills and good attention to detail
- Excellent written and verbal communication skills at all working and management levels
The job-holder will be expected to have a working level of knowledge of, and to use, the following (or similar equivalent) software tools:
- Primavera P6 (Scheduling)
- Synchro (4D modelling)
- Acumen Fuse (Schedule Analysis)
- Microsoft Office software (Excel, Word, PowerPoint, Access)
- Teamcenter (Document Control)
Desirable
- Experience of developing estimates and budgets for major infrastructure programmes
- Experience of working in a large integrated team over the full lifecycle of a project
- Experience in presenting complex information to senior executives and shareholders
- Experience in the Nuclear sector
- Influencing skills
- Ability to build relationships with Project stakeholders, and to act on behalf of the Programme Team as their representative
The HPC Project Controls team operate or interface with the following key systems and a working knowledge of these systems would be an advantage:
- EcoSys (Cost, Changes, Earned Value Management)
- ARM (Risks, Opportunities, Trends)
- @risk (QCRA)
- Safran (QSRA)
- Adobe Professional (Report Publishing)
- Power BI (Business Intelligence Analytics)
- SAP (Financial)
- CEMAR (Supply Chain)
Sponsor check
Wood holds a Home Office sponsor licence (Skilled Worker route), checked against the register published 23 Nov 2026. We read this advert: no sponsorship restrictions. Home Office FOI figures: 151 visa sponsorships in 2021–24.
How we check sponsorshipSponsor check
- Sponsor register
Wood is on the Home Office register of licensed sponsors: licensed since at least 2021.
Home Office register · published 23 Nov 2026
- Visa sponsorships
151 visa sponsorships in 2021–24 (Home Office FOI 2025/12841).
- From the advert
The advert doesn't mention sponsorship.
Read from the advert
Facts from the Home Office register of licensed sponsors and Home Office FOI figures. We don't judge employers; check the advert and the register yourself.
Our estimate from the job title
- Likely occupation
- SOC 2127 · Engineering project managers and project engineers
- Going rate
- £51,900 a year (£26.62/h)estimate
- Visa route
- Likely eligible for Skilled Worker sponsorship
- Visa salary for this occupation
- £51,900 · new entrants £36,300estimate
- Typical UK pay
- £53,064 median full-time
The employer picks the real occupation code on the Certificate of Sponsorship. If it picks a different one, the visa salary changes. How we read this
Wood
- Sponsor licence
- Licensed · Worker
- Visa sponsorships
- 151 · 2021–24
- Visa routes
- Global Business Mobility: Graduate Trainee, Global Business Mobility: Senior or Specialist Worker, Skilled Worker
- Industry
- Technology
- Location
- Bridgwater
Wood is a licensed UK visa sponsor. Home Office figures released under the Freedom of Information Act show Wood assigned 151 Certificates of Sponsorship in 2021–24 and 36 in 2025 for Skilled Worker and Global Business Mobility visas.
Similar sponsor-licensed roles
The closest matches at other employers with active sponsor licences.
Senior Commissioning Engineer EDF Energy · Bridgwater Sponsorable from abroad
Construction Planner Cavendish Nuclear · Taunton Sponsorable from abroad
Assistant Project Manager - HPC Commissioning Mactech Energy Group · Bridgwater Sponsorable from abroad B( Construction Planner (Bridgwater, GB, TA6) BOUYGUES (U.K.) LIMITED · Bridgwater Sponsorable from abroad
Construction Planner Babcock International Group · Taunton Sponsorable from abroad AE Welding Engineer - Bridgwater Altrad Employment Services · Bridgwater Sponsorable from abroad AE Project Planner - Nuclear Construction Assystem Energy & Infrastructure · Bridgwater Sponsorable from abroad
Electrical Project manager Laing O'Rourke · Bridgwater Sponsorable from abroad New roles like this
Added in the last 48 hours by other sponsor-licensed employers.
Operations Engineer Edina UK · Livingston Sponsorable from abroad
Senior Engineer - Conventional Mechanical Support Equipment Rolls-Royce SMR · Manchester Sponsorable from abroad LR Shift Engineering Team Leader Lancashire Renewables · United Kingdom Borderline for a visa
Asset Manager Boldyn Networks Group Limited · United Kingdom Sponsorable from abroad
Mechanical Engineer II - Nuclear Systems Holtec Britain · Almondsbury Sponsorable from abroad MD Environmental Manager (DBS) Masdar UK Development Company Limited · London In-UK only: the advert sponsors candidates already in the UK
Subregional Head of Energy Efficiency Management Digital Realty · London Sponsorable from abroad Roles like this at sponsors
Licensed UK visa sponsors
Senior Commissioning Engineer EDF Energy · Bridgwater Sponsorable from abroad
Construction Planner Cavendish Nuclear · Taunton Sponsorable from abroad
Assistant Project Manager - HPC Commissioning Mactech Energy Group · Bridgwater Sponsorable from abroad